The House is a Work in Progress

The lower level walls and floor have been poured. The lumber package for lower level has been delivered.




Our contractor, Matt Kroll, (center), his right hand man, Steve, (left) and Doug (right) have begun the framing of the lower level.



We now have walls - downstairs. 

Yes, the concrete floors in the lower level and the entry are colored concrete.



And just for the record - it was 95 degrees here in northern MI today. Brutal!